MEP Nexus

Location: San Diego, CA

Last Analysis: May 20th, 2024

Issue Hotspot Preview

A quick glance at issue locations on your drawing. Click below for a detailed view.

No drawing preview available.

Upload a PDF or image file during project creation to see a preview.

Compliance Score

82%

Critical Violations

2

Immediate attention required

Warnings

2

Potential compliance issues

Informationals

1

Suggestions & best practices

Documents Analyzed

125

Drawings, specs, and more

Compliance Breakdown by Discipline

Top 5 Violations

Most critical issues found in this project.

  • Missing trap primer for floor drain

    IPC 1002.4.1

  • Insufficient working clearance for electrical panel

    NEC 110.26(A)(1)

  • Improper duct support spacing

    SMACNA 2005 - Chapter 4

  • Incorrect fire alarm strobe placement

    NFPA 72 - 18.5.5.4

  • Outlet box overfilled

    NEC 314.16(B)

All Compliance Issues

A complete list of all issues identified in this project analysis.

SeverityStatusIssueDisciplineAssigneeActions
Critical
Assigned
Insufficient working clearance for electrical panel
ISS-E-001
Electrical
T
Warning
In Review
Improper duct support spacing
ISS-M-003
Mechanical
S
Critical
New
Missing trap primer for floor drain
ISS-P-002
Plumbing
Unassigned
Warning
Resolved
Incorrect fire alarm strobe placement
ISS-F-001
Fire Alarm
T
Info
Closed
Outlet box overfilled
ISS-E-004
Electrical
Unassigned